Bridge Over Al Glaa’ Bridge

Project Name:- Bridge Over Al Glaa’ Bridge.
Location:-Masr Al Gedida.
Project State:-Constructed.
Cost:- 280 Million EGP.
Systems used:-Continuous Steel Beams and Precast Beams.
Entities Involved in the Project:-
Implementation and supervision: - Armed Forces Engineering Authority (Department of Military Engineers).
Contractor Consultant: Arab House of Engineering (AHE)
Contractor: El Soadaa Group for Construction and Building (S.G).
Project Description:- The Bridge is Constructed to Pass Al-Glaa’ Existing Bridge and Solve the Traffic Crisis in Masr Al Gedida. 

Bridge Over Al Glaa’ Bridge

AHE